480 Biomass, Detroit Stoker traveling grate
94.5% boiler availability
Together with our client, Deltaway has improved several key performance
indicators at Pierrelatte, since its contract began in 2013.
• Increased power sales from 74 Gwh to 79 Gwh
• Increased heat recovery from 118 to 149 Gwh
• Increased plant net load from 9.24 mw to 9.51 mw
• Decreased biomass consumption from 0.74 tons per mwh to 0.64 per mwh
• Increased boiler availability by 16 percent, to 94.5 percent